Camp Ripley

Camp Ripley Storm Sewer Evaluation and Design

Since the early 1980s, the Camp Ripley cantonment area was subject to extensive flooding. With plans to add new facilities, the problem was likely to worsen. Sambatek was selected to evaluate the camp's existing storm sewer system, provide recommendations for correcting deficiencies, and prepare construction plans and specifications.

Pleased with our work, Camp Ripley extended our contract to include the design and construction of a stormwater detention ponds system, oil/water/grit separator, wash platform, and treatment and re-circulation system.