PROJECT SPECS:

LOCATION:

Cottonwood, MN

Year Completed:

2017

Size:

6,000 feet of PVC watermain

Client:

City of Cottonwood, MN

Architect:

NA

Other Partners:

NA

The 2016-2017 Watermain and Street Maintenance project provided a much-needed upgrade to the city of Cottonwood’s infrastructure.

Sambatek provided design and construction administration services to the City of Cottonwood on a watermain and street maintenance project that included the installation of over 6,000 feet of PVC watermain and 12,000 tons of bituminous pavement throughout the city. The project replaced a significant portion of the existing water distribution system due to the age and condition of the facilities.

In addition to the water improvements, several streets throughout the city were improved through a variety of rehabilitation methods (edge mill and overlay, full mill and overlay, full depth asphalt removal, aggregate base reshaping, and paving). The project was completed in 2017 with a total construction cost of $2.2 million.